Material changes to capacity, classification, status, and methodology are logged here. Minor copy edits are not included.
Program guides and payment calculator
Previous
Alternative rates added together, universal DSGS/ELRP pricing and a flat PowerPair maximum included in projections
Current
Utility- and subgroup-specific terms, four separate payment scenarios and explicit unsupported-model handling
Removed the unsupported winter adder, generic DSGS rate and automatic installation incentive. Separated residential A.6 closure from current ELRP pathways; capped the ELRP illustration by power, duration and dispatch hours.
Live capacity comparisons and geographic discovery
Previous
Peak capability and event results from different entity types shared one ranking; location rows displayed capacity-evidence badges
Current
Separate groups for each entity type and capacity basis, visible source scope/date and territory-specific evidence badges
Equal MW units do not make different measurements comparable. State and technology pages now explain documented subsets and link relevant program eligibility guides.
Unsupported press endorsements, queue-mapping capability, automatic multi-provider delivery, fixed response times and unverified payment-success messages
Current
Removed unsubstantiated endorsements and capabilities; clarified human inquiry review, current plan features and payment confirmation limits
Visible copy now follows the implemented directory, lead-review and checkout flows. A checkout redirect alone does not establish a paid subscription, reserved sponsor placement or activation.
News source scope and dates
Previous
Wrong GMP and DCD source dates, home-battery-only interpretation of 90 MW, generic lease pricing and an unsupported completed 96 MW facility claim
Current
Correct source dates, mixed battery-network scope, conditional lease terms and a sourced DCD interview summary
Reviewed the news source links, added buyer context to historical reports, and repaired primary-source links for Sunrun, NVIDIA and NRG.
Unsupported nationwide earnings, fee and payback ranges, and statewide open-enrollment claims
Current
Dated program-specific examples, explicit utility/equipment eligibility and current enrollment routes
Reviewed all 16 blog articles. Corrected Tesla DSGS compensation, separated seasonal and per-event payment units, and removed unsupported economic and enrollment promises. Each article now shows its review scope and section-level sources.
Demand response described as separate from VPPs, with PJM and ISO-NE new DER models labeled live
Current
Demand response/VPP overlap and dated, service-specific market implementation context
Removed the false export-only definition and unsupported telemetry or revenue comparisons. ISO New England's new model is effective November 1, 2026; PJM's full energy/ancillary model remains a later milestone in the reviewed material.
OpenADR 3 described as replacing 2.0, with universal certification and deployment-time assertions
Current
Version/profile-specific guidance, scoped evidence and dependency-based delivery checklists
OpenADR 3 coexists with 2.0a/b. Removed unsupported integration-speed, pilot-conversion, procurement-duration and budget-treatment claims; protocol conformance does not establish program qualification.
Edition date used as publication date, with Tesla's historical event MW described as peak-dispatchable capacity
Current
October 12 posting date, preserved historical ordering and a visible October 21 correction
Preserved the monthly editorial snapshot rather than silently replacing its figures with live rankings. Corrected Tesla's capacity basis, identified EnergyHub's older disclosure as historical, and added claim-specific sources. The edition date remains documented in the article.
An unsourced research placeholder presented as a directory profile with program, location and asset tags
Current
Removed from provider inventory; old URL redirects to the data-center flexibility overview
The record did not establish an identifiable operating entity or source-backed program. The related overview is the appropriate destination for research.
Tesla Virtual Power Plant
Previous
500 MW; prior program, count, territory and market assertions
Current
500 MW event performance; claim-specific sources and location scope
Removed unsupported household/device totals and sub-second response claims. Separated California DSGS, utility ELRP and ConnectedSolutions terms; Connecticut uses a separate battery enrollment route.
8500 MW; prior program, count, territory and market assertions
Current
8500 MW managed portfolio; claim-specific sources and location scope
Replaced an unsupported largest-platform claim and annual payout figure with the provider’s disclosed portfolio scope. Cleared state tags that were not established by a state-specific program source.
6000 MW; prior program, count, territory and market assertions
Current
6000 MW managed portfolio; claim-specific sources and location scope
Confirmed NRG ownership; removed unsupported site totals, lifetime payouts and the incorrect PJM 4-CP program description. The former owner is not presented as a current partner.
5200 MW; prior program, count, territory and market assertions
Current
4800 MW managed portfolio; claim-specific sources and location scope
Replaced unsupported 5.2 GW and 8,400-site figures with a dated North American disclosure. Removed the unsupported JuiceNet offering and broad device/utility partner list.
1200 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 1.2 GW, asset count, uptime and wholesale-market claims. Corrected software and managed services being described as Stem owning every battery.
2400 MW; prior program, count, territory and market assertions
Current
8300 MW managed portfolio; claim-specific sources and location scope
Removed the unsupported standalone 2.4 GW and enrolled-customer total. The acquisition disclosure covers the combined global platform and must not be added to AutoGrid again.
500 MW; prior program, count, territory and market assertions
Current
500 MW installed portfolio; claim-specific sources and location scope
Removed unsupported ISO participation, program aliases and site count. Kept installed solar separate from dispatchable VPP MW and storage energy in MWh.
367 MW; prior program, count, territory and market assertions
Current
367 MW nominated capacity; claim-specific sources and location scope
Removed the stale device count and unsupported claim of access to every North American ISO. Added the primary nominated-capacity source and retained PJM as documented market access.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported fleet counts and current territory/market tags. The utility’s closure notice supports a historical profile, not an active procurement option.
1800 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Stopped presenting the older 1.8 GW article as current post-acquisition capacity. Corrected DERs being counted as enrolled households and removed unsupported state/market tags.
350 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 350 MW U.S. capacity, 200,000 U.S. participants, three-state coverage and retail offers being conflated with the Kraken software platform.
600 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 600 MW and 35,000-device figures, broad market tags and unconfirmed utility partners. Used specific California enrollment and APS DERMS sources.
130 MW; prior program, count, territory and market assertions
Current
160 MW event performance; claim-specific sources and location scope
Replaced the unsupported 130 MW value with APS’s reported 160 MW demand reduction and counted thermostats as devices rather than households. Removed the inaccurate Phoenix-and-Tucson service claim.
55 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 55 MW, 4,500 participants, annual savings and first-in-the-nation claims. Replaced an ambiguous program name with current utility storage pathways.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Rechecked official thermostat eligibility and removed the unsupported wholesale-market and partner tags. The utility service area is not all of New York State.
180 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 180 MW and 22,000-participant totals, universal winter dispatch and Rhode Island being presented as a current National Grid program territory.
210 MW; prior program, count, territory and market assertions
Current
210 MW enrolled program; claim-specific sources and location scope
Rechecked the existing state-specific correction. Removed unverified partner/wholesale-market tags and a generic C&I offering that was not established by the reviewed battery enrollment sources.
45 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 45 MW and 6,500-participant totals and unverified device-partner tags. The official page documents the 2026 reopening and current eligible battery requirements.
850 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 850 MW and 720,000-household totals. Separated the Power Manager name from other Duke service-area brands and removed unverified partner lists.
4500 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 4.5 GW and site totals, an unverified greater-than-1-MW threshold and private companies presented as ERCOT partners. This is a market-resource framework.
3000 MW; prior program, count, territory and market assertions
Current
3000 MW managed portfolio; claim-specific sources and location scope
Corrected forecast capacity being confused with managed electrical load. Removed an unsupported exact household count and state/market tags inferred from partner reach.
95 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Updated the outdated distressed/bankruptcy-pending description to Sunnova’s own closure notice. Removed unsupported MW, customer counts and current program coverage.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported charger count, first-site claim and current standalone territory/market tags. Clarified the asset acquisition rather than assuming every historical program continues.
28 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported U.S. aggregate MW, vehicle totals and market coverage. Global battery projects and historical fleet examples are not a U.S. V2G fleet total.
65 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 65 MW, customer count and market tags. Corrected the confused Soleil community references to the documented Soleil Lofts project in Herriman, Utah.
2400 MW; prior program, count, territory and market assertions
Current
575 MW managed portfolio; claim-specific sources and location scope
Replaced broken website links and unsupported 2.4 GW, site and ISO claims. Used the current official commercial demand response page and its ERCOT contract figure.
70 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed unsupported 70 MW and 8,500-customer totals and unconfirmed battery partners. Replaced per-event-payment wording with the utility’s current enrollment and ongoing bill-credit structure.
450 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Updated proposal-only wording to the utility’s approved-pilot announcement. Removed 450 MW from the capacity band because approval of a pilot does not establish operating MW.
Georgia Power Customer-Sited Solar + Storage Pilot
Previous
50 MW; prior program, count, territory and market assertions
Current
50 MW announced target; claim-specific sources and location scope
Separated the 50 MW customer-sited pilot aim from Georgia Power’s unrelated 765 MW utility-scale BESS construction. Removed the broken IRP PDF link and market/partner tags.
55 MW; prior program, count, territory and market assertions
Current
57 MW managed portfolio; claim-specific sources and location scope
Updated the older 55 MW figure to the partner’s March 2026 57+ MW portfolio disclosure. Removed an unsupported 1,500-system cap and kept the new battery pilot separate from the broader portfolio.
132 MW; prior program, count, territory and market assertions
Current
132 MW event performance; claim-specific sources and location scope
Corrected historical device counts being treated as current households. Kept the case-study event MW distinct from ongoing thermostat flexibility and the separate battery program.
55 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed the old 55 MW Battery Bonus figure from the successor BYOD Plus profile. Battery Bonus enrollment and deadlines do not establish current BYOD Plus capacity.
1000 MW; prior program, count, territory and market assertions
Current
1000 MW announced target; claim-specific sources and location scope
Added the target years and current development milestones. Removed an unsupported wholesale-participation tag; Texas geography alone is not evidence of registered ERCOT capacity.
100 MW; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Replaced the unrelated basepower.com website. Removed an unverified current 100 MW total, fixed equipment sizes and universal low/no-upfront-cost wording.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Rechecked the platform and California integration sources. Removed unsubstantiated New York/Texas service tags; retained 300 MW only as a 2027 ChargeWise target, not current capacity.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed inferred wholesale-market tags and California headquarters being used as operating coverage. Updated DISCO’s broader multi-device scope from the current company page.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed DC headquarters as a program territory and an inferred PJM participation tag. A 96 MW data-center site rating is not measured flexible portfolio MW or proof that the entire deployment is operating.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Replaced the third-party-distributed release with the company’s own announcement. Removed unverified market tags, a California office being used as coverage and an unsubstantiated Arcadia partnership.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Removed headquarters-derived California coverage and inferred CAISO/MISO market participation. Flexible interconnection software is not an aggregate VPP fleet.
Capacity not reported; prior program, count, territory and market assertions
Current
Capacity not reported; claim-specific sources and location scope
Provider-submitted claims remain attributed and unverified; removed the stale internal three-design-partner/early-access statement that conflicted with the submitted profile. Public site retrieval did not establish independent references.
Ten-state footprint, unverified market tags and fleet counts, generic New England enrollment wording
Current
Four documented U.S. program states, separately noted Puerto Rico activity, source-specific eligibility and field review dates
Limited the discovery tags to locations explicitly supported by the reviewed company disclosure. This is a sourced subset, not Sunrun's full footprint. Removed unsupported fleet counts and wholesale-market tags; corrected ConnectedSolutions eligibility. Retained the earlier California capacity figure and its independent review date.
One summer-plus-winter battery incentive across MA, CT and NH, with 18,000 participants
Current
State-specific performance incentives and enrollment routes; participant count not reported
Mass Save's standard small-battery terms do not support a universal winter payment. New Connecticut battery applicants use Energy Storage Solutions. Gross program rates may differ from the customer's payout. Removed the unsupported participant count without changing the earlier fleet-capacity review.
Some recap dates presented as announcement dates, preliminary Tesla dispatch numbers, and proposal targets described as open capacity
Current
Original source dates and clearer distinctions between events, plans, pilots and delivered results
Replaced secondary recaps with regulator or company sources where available. Corrected the shared Sunrun/Tesla event, PG&E SHARE scope, and DTE, NJBPU and Hyundai announcement dates. Attributed BlocPower reporting to Latitude Media and removed the unsupported comparison with OhmConnect.