All power markets
Market guide
Reviewed June 26, 2026

Virtual Power Plants in ERCOT

Electric Reliability Council of Texas

ERCOT's market gives flexible loads and distributed assets several ways to support grid reliability. These include Load Resource participation, Emergency Response Service, voluntary demand response, and the Aggregate Distributed Energy Resource pilot.

Matched profiles
18
Active profiles
16
Portfolio capacity
38.9 GW
Technology types
7

How flexibility reaches ERCOT

The ADER pilot tests how groups of distribution-connected premises or devices can operate as a single dispatchable resource. Participation began in 2023 and has continued to evolve through additional phases, operating models, and limits set through ERCOT and Public Utility Commission of Texas processes.

ERCOT is not subject to FERC Order No. 2222 and uses its own Texas market rules. Buyers should separate ADER participation from Load Resource, Emergency Response Service, retail demand-response, and bilateral flexibility products because eligibility, telemetry, dispatch, and settlement requirements differ.

What buyers should compare

1

Choose the right pathway

Ask whether the proposed resource will participate as an ADER, Load Resource, ERS resource, retail program, or another arrangement. The label 'VPP' alone does not define the market product.

2

QSE and telemetry readiness

Wholesale participation may require a Qualified Scheduling Entity, validated premise data, telemetry, controls, and the ability to follow ERCOT instructions within the applicable model.

3

Avoid double counting

Confirm whether the same premises are enrolled in utility load-management, ERS, or other programs and whether simultaneous participation is permitted for the proposed service.

Provider shortlist

VPPs associated with ERCOT

These profiles report activity in ERCOT. Review source links and contact each provider to verify current enrollment, market products, and site eligibility.

Featured
CPower Energy Management logo

CPower Energy Management

Active
·Commercial & Industrial
Dispatchable capacity
6.3 GW
Assets
13K
11 states

Monetizes C&I flexibility through 30+ programs across nearly every North American market.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Verified
View
AutoGrid Flex logo

AutoGrid Flex

Active
·Mixed
Dispatchable capacity
6.0 GW
Assets
1.2M
7 states

Enterprise-grade VPP and DER orchestration software used by utilities and retailers worldwide.

Why this matched

ERCOT
Mixed DER
Battery Storage
EV / V2G
+1
Verified
View
Featured
Enel X North America VPP logo

Enel X North America VPP

Active
·Commercial & Industrial
Dispatchable capacity
5.2 GW
Assets
8.4K
9 states

Combines C&I curtailment, behind-the-meter batteries, and EV charging into a unified flexibility platform.

Why this matched

ERCOT
Demand Response
Battery Storage
EV / V2G
+1
Verified
View
Featured
ERCOT Controllable Load Resources logo

ERCOT Controllable Load Resources

Active
·Utility / Wholesale
Dispatchable capacity
4.5 GW
Assets
240
Texas

ERCOT's framework enrolling large loads — including data centers and crypto — into wholesale ancillary services.

Why this matched

ERCOT
Demand Response
Mixed DER
Verified
View
Featured
Large Load Flex Coalition (planned) logo

Large Load Flex Coalition (planned)

Planned
·Utility / Wholesale
Dispatchable capacity
3.5 GW
Assets
60
7 states

Industry coalition formalizing flexibility commitments from hyperscale data centers and AI training clusters.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
View
Featured
Renew Home logo

Renew Home

Active
·Residential
Dispatchable capacity
3.0 GW
Assets
3.0M
10 states

Joint venture of Google Nest Renew and OhmConnect orchestrating 3 GW of residential flexibility.

Why this matched

ERCOT
Smart Thermostats
Demand Response
EV / V2G
+1
Verified
View
Featured
Uplight Flex logo

Uplight Flex

Active
·Mixed
Dispatchable capacity
2.4 GW
Assets
1.8M
12 states

Powers thermostat, EV, and battery programs for 80+ North American utilities.

Why this matched

ERCOT
Smart Thermostats
Battery Storage
EV / V2G
+1
Verified
View
Shell Energy / MP2 Flex logo

Shell Energy / MP2 Flex

Active
·Commercial & Industrial
Dispatchable capacity
2.4 GW
Assets
5.2K
6 states

Texas-based retail provider operating large C&I demand response across ERCOT, PJM, and NYISO.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Verified
View
Featured
EnergyHub Mercury logo

EnergyHub Mercury

Active
·Mixed
Dispatchable capacity
1.8 GW
Assets
1.0M
12 states

Mercury platform manages thermostats, batteries, EVs, and water heaters for major utility programs.

Why this matched

ERCOT
Smart Thermostats
Battery Storage
EV / V2G
+2
Verified
View
Featured
Voltus logo

Voltus

Active
·Commercial & Industrial
Dispatchable capacity
1.5 GW
Assets
4.5K
11 states

Aggregates flexible commercial and industrial load to deliver capacity, energy, and ancillary services to grid operators.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Verified
View
Leap logo

Leap

Active
·Mixed
Dispatchable capacity
800 MW
Assets
200K
4 states

Enables third-party DER operators to participate in CAISO, ERCOT, ISO-NE, and NYISO wholesale markets.

Why this matched

ERCOT
Battery Storage
EV / V2G
Smart Thermostats
+1
Verified
View
Generac Grid Services logo

Generac Grid Services

Active
·Mixed
Dispatchable capacity
600 MW
Assets
35K
7 states

Aggregates Generac PWRcell batteries and standby generators into utility VPP programs.

Why this matched

ERCOT
Battery Storage
Mixed DER
Verified
View
Octopus Energy Kraken Flex logo

Octopus Energy Kraken Flex

Active
·Residential
Dispatchable capacity
350 MW
Assets
200K
3 states

Combines retail electricity, EV smart charging, and aggregated DERs into a unified flexibility platform.

Why this matched

ERCOT
EV / V2G
Battery Storage
Smart Thermostats
Verified
View
OhmConnect logo

OhmConnect

Active
·Residential
Dispatchable capacity
250 MW
Assets
250K
2 states

Pays California households to reduce electricity use during grid emergencies and high-stress hours.

Why this matched

ERCOT
Demand Response
Smart Thermostats
EV / V2G
Verified
View
Featured
Tesla Virtual Power Plant logo

Tesla Virtual Power Plant

Active
·Residential
Dispatchable capacity
100 MW
Assets
75K
4 states

Aggregates Powerwall batteries across CA, TX, and PR to provide dispatchable capacity and frequency response.

Why this matched

ERCOT
Battery Storage
Solar + Storage
Verified
View
Sunnova Adaptive Home logo

Sunnova Adaptive Home

Active
·Residential
Dispatchable capacity
95 MW
Assets
19K
6 states

Aggregates Sunnova-installed home solar + storage systems across the US Sun Belt and Northeast.

Why this matched

ERCOT
Solar + Storage
Battery Storage
Verified
View
Featured
Sunrun Virtual Power Plant logo

Sunrun Virtual Power Plant

Active
·Residential
Dispatchable capacity
80 MW
Assets
16K
10 states

Networks tens of thousands of home batteries to deliver clean dispatchable capacity to utilities and ISOs.

Why this matched

ERCOT
Battery Storage
Solar + Storage
Verified
View
Span Home Energy logo

Span Home Energy

Pilot
·Residential
Dispatchable capacity
35 MW
Assets
12K
6 states

Smart electric panels that enable whole-home flexibility, EV charging coordination, and battery integration.

Why this matched

ERCOT
Mixed DER
Battery Storage
EV / V2G
Verified
View

ERCOT VPP questions

What is an ADER in ERCOT?

An Aggregate Distributed Energy Resource combines multiple distribution-connected premises or devices so the aggregation can respond to ERCOT dispatch instructions under the pilot's participation rules.

Does FERC Order No. 2222 apply to ERCOT?

No. FERC's Order No. 2222 explainer states that it does not apply in the ERCOT area. ERCOT and the Public Utility Commission of Texas govern the relevant Texas participation pathways.

Is the capacity shown here available at my Texas site?

Not necessarily. The displayed number is each matching provider's published portfolio capacity. Availability depends on the site's utility territory, asset configuration, market pathway, and current provider enrollment capacity.

Need qualified capacity in ERCOT?

Send one brief to a focused provider shortlist and compare responses against the same project requirements.

Start a capacity brief