Virtual Power Plants in ERCOT

Electric Reliability Council of Texas

ERCOT's market gives flexible loads and distributed assets several ways to support grid reliability. These include Load Resource participation, Emergency Response Service, voluntary demand response, and the Aggregate Distributed Energy Resource pilot.

Matched profiles
4
Active profiles
4
Supported capacity claims
3
Technology types
3

How flexibility reaches ERCOT

The ADER pilot tests how groups of distribution-connected premises or devices can operate as a single dispatchable resource. Participation began in 2023 and has continued to evolve through additional phases, operating models, and limits set through ERCOT and Public Utility Commission of Texas processes.

ERCOT is not subject to FERC Order No. 2222 and uses its own Texas market rules. Buyers should separate ADER participation from Load Resource, Emergency Response Service, retail demand-response, and bilateral flexibility products because eligibility, telemetry, dispatch, and settlement requirements differ.

What buyers should compare

1

Choose the right pathway

Ask whether the proposed resource will participate as an ADER, Load Resource, ERS resource, retail program, or another arrangement. The label 'VPP' alone does not define the market product.

2

QSE and telemetry readiness

Wholesale participation may require a Qualified Scheduling Entity, validated premise data, telemetry, controls, and the ability to follow ERCOT instructions within the applicable model.

3

Avoid double counting

Confirm whether the same premises are enrolled in utility load-management, ERS, or other programs and whether simultaneous participation is permitted for the proposed service.

Provider shortlist

VPPs associated with ERCOT

These profiles report activity in ERCOT. Review source links and contact each provider to verify current enrollment, market products, and site eligibility.

Featured

CPower Energy Management (NRG)

Active
Aggregator / operator
Source-reported capacity
6.0 GW
Reported participants
Not reported
Not confirmed
Managed portfolio

NRG-owned C&I demand response and energy flexibility platform. Review market-specific programs, resource eligibility and dated portfolio evidence.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Source-linked
Reviewed Oct 2026
View
Featured

ERCOT Controllable Load Resources

Active
Market resource
Source-reported capacity
Not reported
Reported participants
Not reported
1 documented state
Not reported

ERCOT Controllable Load Resources: registration, dispatch and ancillary-service qualification for flexible Texas loads.

Why this matched

ERCOT
Demand Response
Mixed DER
Source-linked
Reviewed Oct 2026
View

Shell Energy Solutions / MP2 Demand Response

Active
Aggregator / operator
Source-reported capacity
575 MW
Reported participants
Not reported
9 documented states
Managed portfolio

Shell Energy Solutions / MP2 C&I demand response in PJM and ERCOT, with source-reported ERCOT contracted load.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Source-linked
Reviewed Oct 2026
View
Featured

Voltus

Active
Aggregator / operator
Source-reported capacity
8.5 GW
Reported assets
22K
Not confirmed
Managed portfolio

Demand response and DER aggregation across U.S. and Canadian wholesale markets, with source-reported portfolio scale and program-specific eligibility.

Why this matched

ERCOT
Demand Response
Battery Storage
Mixed DER
Source-linked
Reviewed Oct 2026
View

ERCOT VPP questions

What is an ADER in ERCOT?

An Aggregate Distributed Energy Resource combines multiple distribution-connected premises or devices so the aggregation can respond to ERCOT dispatch instructions under the pilot's participation rules.

Does FERC Order No. 2222 apply to ERCOT?

No. FERC's Order No. 2222 explainer states that it does not apply in the ERCOT area. ERCOT and the Public Utility Commission of Texas govern the relevant Texas participation pathways.

Is the capacity shown here available at my Texas site?

Not necessarily. The displayed number is each matching provider's published portfolio capacity. Availability depends on the site's utility territory, asset configuration, market pathway, and current provider enrollment capacity.