Green Mountain Power reports deploying 90 MW of battery power during Vermont's early July 2026 heat. Its July 28 account provides a useful example of coordinating customer and utility batteries to reduce peak demand.

What happened in Vermont

MeasureGMP's July 28, 2026 account
Completed operationEarly July heat event in Vermont
Battery power dispatched90 MW from residential and utility-scale batteries
Estimated peak-cost savingsApproximately $6 million for GMP customers
Broader VPP size110 MW as of July 2026, including other resource types

The 90 MW event result and 110 MW portfolio figure describe different things. Neither is a home-battery-only total. The savings estimate is a system benefit, not a payment promised to each participating household.

How home batteries enter the deployment

GMP offers both a battery lease and Bring Your Own Device enrollment. The lease pairs home backup with shared utility access during peaks. BYOD lets customers choose supported equipment and an installer, then agree how much stored energy to share. These are distinct ownership and payment arrangements.

PathwayPublished offer checked October 28, 2026Confirm before signing
LeaseTwo batteries over ten years: $55 per month or $5,500 upfrontFinal installed cost can vary by site and installer
BYOD$850/kW for a three-hour commitment or $950/kW for four hoursEligible equipment, committed output, incentive cap and backup allocation

The BYOD figures are alternative enrollment incentives, not annual income or amounts to add together. GMP also describes a location-dependent retrofit adder. Ask the utility to confirm eligibility and the written agreement for the specific property.

What a buyer can learn from this case

The procurement lesson is to define the service before comparing fleet sizes. A peak-reduction proposal should specify the target meter boundary, event window and measurement method. Ask for the interval trace across the whole window, including recharge, rather than relying on a single headline MW figure.

  • Separate home batteries, utility-scale batteries and other resources in the proposed delivery stack.
  • Request the savings calculation: avoided cost category, applicable period, baseline and program costs.
  • Write down backup reserve, storm preparation, customer overrides and responsibility for failed communications.
  • For homeowners, compare the installed cost, lease or ownership terms, warranty and exit conditions alongside the incentive.

Evidence you would still need for a contract

An operator's public account helps establish deployment experience. Contract diligence still requires event-level records, an agreed performance test and evidence that resources can deliver at the location being procured. Keep estimated avoided costs separate from verified cash settlements and participant compensation.

Compare written offers

Sources and further reading

Frequently asked questions

Was this a real operating VPP deployment?

Yes. GMP's dated utility account describes a completed July 2026 dispatch from an existing Vermont battery network.

Were the reported savings independently verified by VPPdirectory?

No. We checked the primary utility publication and enrollment pages, but did not audit telemetry, settlement records or the savings model.

How should I compare the lease and BYOD options?

Compare total installed cost, ownership, committed discharge duration, backup reserve and exit terms using the current written offer for your property.